Construction projects across the north west

At Buildmain Ltd in Manchester, we’re proud of what we can do! Take a look at some of our completed work, then get in touch. If you have any questions, check our FAQs or call the team.

Quality work on every project

Workers in a large industrial space

Client: Outreach Community & Residential Services

H & S: site managers

Value: £100,500

Duration: 8 weeks

 

Summary:

  • 1st floor phase 1 fit out refurbishment to create new office space and community facilities.

  • Pre-start meeting and provide all RAMS.

  • Isolate all services, strip and remove existing welfare and all partition ready to take new.

  • Remove existing window and supply and fit new, mechanically cut out pre-cast concrete.

  • Remove staircase, supply and fit new timber staircase as per drawing along with required hand rail

  • Supply and fit new partition and suspended ceilings as per drawing to create new lay out and office and welfare areas.

  • Fit new architraves door liners with fire doors and ironmongery to suit.

  • Tape and joint all partition as required and decorate. 

  • Supply and fit new kitchen of required lay out with all appliances requested.

  • Upgrade plumbing and supply and plumb new combi boiler and required radiators with TVRs and all associated pipework - alterations made to drainage to accommodate new lay out.

  • DDA supply and fit Doc M pack with required toilet pan and all associated pipework, along with shower and small cloak room sink.

  • Create wet floor area to accommodate shower with shower bar and mixer tap.

  • Tile all welfare areas and kitchen splash back. 

  • Electrical work - supply and install a new lay out, including sockets, LED lights, Cat 5 data points, emergency lighting and fire alarm.

  • Fit intercom system along with required telephone points.

  • Make new entrance door opening, supply and fit new entrance doors and fit all new required ironmongery. 

  • Lay carpet tiles in required areas.

 

Works were completed within budget and on time.

Before and during the work

After

Brick Wall

Client: Loreto Sixth Form College

H & S: site managers

Value: £7,500

Duration: 2 weeks

 

Summary:

  • Concrete hardstanding and drainage works.

  • Preliminaries and travel.

  • Pre-start meeting.

  • Provide RAMS for all work activities

  • Cordon off work area at the top and bottom of site.

  • Mechanically cut down existing trees as required.

  • Mechanically excavate trench using 3 ton machine approx. 300(d) x 30600(l) x 3200/4500(w)

  • Supply and lay 100mm of class 1 MOT.

  • Supply and lay 200mm square edge concrete edgings to match existing to the rear of the proposed slab.

  • Supply and lay 1200s DPM

  • Supply and fix 1 layer of A393 reinforcing steel mesh.

  • Install shuttering for expansion joints.

  • Supply and lay 35 gauge concrete - approx. 180 x 4500 x 3200/4500mm (approx. 120M2 (21.2M3)).

  • Allowance made for 15mm expansion joints, slab laid in 3 sections.

  • Agitated with vibrating poker.

  • Float and brush to a finish.

  • Excavate trench for drainage works - 2000 x 150 x 150mm.

  • Supply and lay A15 100mm channel drain set in gauged concrete.

  • Make good any effected surfaces.

Before

During and after work

Client: Laltex Group Leigh

Value: £60,000+

Project: security lodge demolition and reinstatement works

 

Summary:

  • Site survey.

  • Full H&S package.

  • Pre-start meeting.

  • Regular consultation meetings.

  • Site set-up.

  • Isolation of services.

  • Strip out.

  • Demolition of security office.

  • Break out of existing traffic island.

  • Reinstatement works of traffic island.

  • Block paving.

  • Install of automatic traffic barrier system.

  • Electrical works.

  • Landscaping.

  • Removal of all debris.

  • Clean and hand over.